| Term Papers Count: 63,000 | ||
| Home | Join | Login | Logout | Forgot Password | FAQ | Contact | ||
|
| ||
Term Papers on Channel Tunnel (Chunnel)
Channel Tunnel (Chunnel) Statistics: Location: Folkestone, England, and Sangatte, France Completion Date: 1994 Cost: $21 billion Length: 163,680 feet (31 miles) Purpose: Railway Setting: Underwater Materials: Steel, concrete Engineer(s): Transmanche Link Engineering Firm When England and France decided to link their two countries with a 32-mile rail tunnel beneath the English Channel, engineers were faced with a huge challenge. Not only would they have to build one of the longest tunnels in the world; they would have to convince the public that passengers would be safe in a tunnel this size. Tunnel fires, like the Holland Tunnel disaster, were common at this time. How did the engineers resolve this problem? They built an escape route. The Channel Tunnel, also called the Euro Tunnel or Chunnel, actually consists of three tunnels. Two of the tubes are full sized and accommodate rail traffic. In between the two train tunnels is a smaller service tunnel that serves as an emergency escape route. There are also several "cross-over" passages that allow trains to switch from one track to another. Just one year after the Chunnel opened, this engineering design was put to the test. Thirty-one people were tra... This is ONLY a preview of the article. If you would like to view the entire document, you must subscribe to Digital Term Papers. Please register below now! Digital Term Papers has over 63,000 essays, term papers, and book notes online. Many paper sites will charge you hundreds of dollars for a single paper. Digital Term Papers only charges $14.95 for a one month membership with instant account activation! Don't waste anymore time! Join NOW!!!
|
|
Copyright 1998-2007 Digital Term Papers. All Rights Reserved.
Forgot Password
Cancel Account
Privacy Policy
Disclaimer
Contact Us
Essay List: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 |